Metal roofing
Architectural shingles
Tile roofing
GAF
Owens Corning
Flat & low-slopeFree roof inspection with deck photos before we talk money - GAF and Owens Corning certified installation
Roofing Before & After in Enterprise, NV
Pictures of a finished roof tell you more than any brochure can. A before-and-after record shows what was actually wrong, what was replaced, and how the finished assembly handles Enterprise’s sun, wind, and summer monsoon runoff. Below is a set of representative roofing jobs laid out the way we document them: the problem we found on inspection, the work we completed, and the result the homeowner can see and live with. Photos will fill these frames as each project gallery is completed.
Styles & brands we work with
- Architectural shingles
- Metal roofing
- Tile roofing
- GAF
- Owens Corning
- Flat & low-slope
Recent Transformations
Each project below stands in for the kind of work we see across Enterprise and the surrounding valley. They are organized by service so you can find the closest match to your own roof.
Roof Repair: Sun-Baked Shingle Field Rebuilt After Granule Loss
The problem: an asphalt shingle roof on a south-facing slope had lost most of its granules, and the homeowner was finding grit in the gutters and downspouts after every windy day. What we did: we replaced the failing shingle field on the exposed slope, installed new underlayment in the affected runs, and refreshed the flashing where the slope met the wall. The result: a shingle surface that matches the rest of the roof and sheds water cleanly again, documented with photos taken from the actual roof for the homeowner’s records.
Roof Replacement: Full Tear-Off and Re-Deck on an Older Home
The problem: a home with an original roof showed soft decking in a few spots and curling shingles along the ridge, the kind of wear that points to moisture sitting under the surface. What we did: we tore off the old assembly, replaced the damaged sheathing, laid new underlayment, and installed a full GAF shingle system with new ridge ventilation. The result: a watertight roof with corrected airflow, backed by our written 90-Day Done Right Promise. If it is not right, we make it right.
Specialty Roofing: Tile Underlayment Refresh for a Desert Home
The problem: a tile roof that looked sound from the street but was leaking at the valleys, because the underlayment beneath the tiles had aged out under years of desert sun. What we did: we lifted the tile field, replaced the underlayment and valley flashing, then reset the original tile in proper courses. The result: tile that keeps its appearance and a waterproof layer that is new underneath, which is where a tile roof actually keeps the water out.
Gutters & Accessories: Gutter Run Replaced and Sloped Correctly
The problem: water was pooling against the foundation during monsoon storms because a gutter run had pulled loose and lost its slope, so it drained backward instead of to the downspout. What we did: we replaced the run with properly sized gutter and reinstalled it on solid hangers at the correct pitch, then cleared and reset the downspout. The result: storm water exits where it should, away from the foundation, and the fascia stays dry.
Emergency & Storm Damage: Wind-Damaged Slope Secured and Repaired
The problem: a wind event lifted shingles along a gable edge and left the underlayment exposed, with a live risk of water entering at the next rain. What we did: we responded quickly to secure the slope, removed the damaged shingles, replaced the damaged underlayment, and reinstalled shingles with new edge flashing. The result: the roof is closed again and the homeowner has a clear photo record of what was fixed and why.
Roof Installation: New Ventilation and Ice-and-Water Preparedness
The problem: an older installation had no ridge vent and a poorly vented attic, so heat built up through the summer and shortened the life of the shingles. What we did: we installed a full ridge vent, matched the intake, and laid a fresh underlayment before the new shingles went down. The result: a cooler attic, a roof built to the manufacturer’s specification, and materials from one of the seven lines we install, including GAF, CertainTeed, and Owens Corning.
Want Results Like These?
If any of these before-and-after jobs look like your own roof, the next step is a free estimate. Call (844) 228-4119 to schedule yours. A live person answers every call, day or night, including during storms. We’ll inspect the roof, show you the photos, and put a written, upfront number in front of you. The number on the estimate is the number on the invoice.
Written by the team at Ridgeline Roofing Co.
See the difference
Before
After
Before
After
Before
After